Vung Tau

Pilot station position:10 Deg 17.04”3 N, 107 Deg 05.17” E Ports: Go Dau, Phumy ports, Caimep ports, Vietsovpetro, PTSC.

Ho Chi Minh

Pilot station position:10 Deg 17.04”3 N, 107 Deg 05.17” E Ports: Nha Rong, Khanh Hoi, Tan Thuan, Ben Nghe, Lotus, Nhabe, Catlai...

PTSC Nghi Son

PTSC Nghi Son

 A. ACCESS CHANNEL

 

1. Min. Depth below chart datum

-9.70 M ( Excluding tide )

 

2. Width

120 M

 

3. Quality of Bottom

Sand bottom

 

4. Required UKC:

0.9 M

 

5. Dredging plan & maintenance

Maintaining to accept 50,000 DWT

 

6. Tidal level:

about 2.5 M / diurnal.

 

B. TURNING BASIN ( CO-ORDINATE : CHART SCALE SYSTERM)

 

1. Location

Lat:19 18 24.7N/ Long:105 49 0.26E

 

2. Diameter :

300M ( R=150 M)

 

3. Min. Depth of berth No.1 below chart datum

-8.60 M ( Excluding tide )

 

4. Min. Depth of berth No.2 below chart datum

-9.50 M ( Excluding tide )

 

5. Quality of Bottom

Sand bottom

 

C. ANCHORAGE

 

1. Location

Lat: 19 17 01N / Long 105 49 50E

 

2. Depth

-13 M

 

3. Quality of Bottom

Sand bottom

 

D. NAVIGATION AIDS

 

1. Channel buoys

06 pcs

 

2. Beacons

Nil

 

3. Transit mark

Nil

 

4. Others

Nil

 

E. PILOTAGE

 

1. Number of Pilot

02 Pilots in duty

 

2. Pilot station

Lat: 19 17 01N / Long 105 49 50E

 

3. Servicing hours

24/24 ( Iagw wp )

 

4. Communication between pilot and vessel

Standby VHF Channel: 16 CH

 

5. Communication / Maneuvering with the harbor

By VHF Channel 09 CH

 

F. TUGBOAT IN PORT ( Rental tug 1,000 CV )

 

1. Rental tug (1,000 CV) in port servicing for vessel LOA < 115 M

 

2. Vessel LOA >115 must be arranged tugboat for assistance from other port

 

G. BERTH FACILITY

 

1. Name of berth

BERTH NO.1

          BERTH NO.2

 

2. Max size DWT accepted

10,000 DWT

50,000 DWT / LOA: 200 m

3. Depth

- 9.50 M ( Excl tide )

-12.00 M ( Excl tide )

4. Length of berth

165.00 M

225.00 M

- Fender Type and materials

- Number & interval

OYLINDER RUBBER

42 fenders, 4m interval

OYLINDER RUBBER

33 fenders, 7m interval

6. Mooring Bollard

08 Pcs

11 Pcs

7. Berth available & occupancy

Cement in bag, coal in blk, iron ore

Wood chips. Project equipment

8.Availability of fresh water

Availability

Availability

9. Bunker supply

Availability

Availability

10. Security level

Level : 1

Level: 1

11. Shore pass ( Crew can go shore )

06.00 Hrs to 24.00Hrs Lt / Daily

06.00 Hrs to 24.00Hrs Lt / Daily.

H. EQUIPMENT FACILITY

1. Shore crane:

07 Units ( 15 to 50 tons )

2. Gantry Crane

01 Unit 40 tons / Outreach 8 – 32 M

3. Forklift :

02 Units ( 06 – 07 tons )

4. Storage capacity

02 Warehouses 2880 SQM

5. Clear height from chart datum

20 M

6. Out reach from fender face

20 M

7. Traveling range

40 M

I. HANDLING RATE

1, Bagged cargo:

1,200 MT / WWD

2. Bulk cargo:

2,000 MT / WWD

3. Equipment :

600 MT / WWD

K. QUARANTINE

1. Availability of radio pratique system

NIL

2. Service hours

Comprehensive hours

3. Necessary enquired documents

Ship sanitation control exemption certificate

L. CUSTOM AND IMMIGARTION

1. Place where officers watching duty

Gang way

2. Working hour

24 Hrs

3. Necessary enquired documents

Crew list, Pass port