Vung Ang
1. Min. Depth below chart datum: -11.80m 2. Min Width: 150m 3. Quality of Bottom: Mud, Sand and some clay
Nha Trang
1. Min. Depth below chart daum: 11.00 2. Min Width: 100.00 3. Quality of Bottom: Sand and mud
Dong Nai
- Access river:: Thi Vai river - Access channel length: 28 miles long from Vung Tau anchorage point
Ho Chi Minh
Pilot station position:10 Deg 17.04”3 N, 107 Deg 05.17” E
Ports: Nha Rong, Khanh Hoi, Tan Thuan, Ben Nghe, Lotus, Nhabe, Catlai...
Access channel: 36-48miles far from Vungtau Pilot station.
Night time navigation for vessel with draft less than 9.5m and LOA less than 175m
Port restriction: LOA 230m, draft 9.5-10.5m depend on daily tide, air draft 44m
Tidal range: irregular diurnal with average tide range 1.1M - 3.8m.
Handling: Pax, bulk, equipments, containers, oil product, chemical, LPG.